TS5000
Installation, details, options

For a larger view, please mouseover the image.
Operating and installation diagram for a TS5000 system.

The TS vessel must always be installed higher than the mechanical seal. The buffer/barrier fluid flows via the return pipe into the vessel and is cooled. The exchange of fluid takes place by the thermosiphon principle or by forced circulation, e.g. with a pumping screw. Connection pipes to the seal should be designed with as little resistance as possible.

1 SPI Measuring unit
2 SPS Level switch
3 From PCV, we recommend using a reverse controlled pressure control
4 SPN
5 SPU
6 Mechanical seal